Preparations for another bight Crossing

You wouldn't be the first person to think i'm insane for wanting to cross the bight in Emigre. I would define insanity as doing the same thing repeatedly and expecting a different result.
How you interpret this definition really shows if you are a sailor or not..
Truth be told, once was not enough so I came back for more.
Dr Kevin, my excellent crew from my recent bight crossing aboard Emigre has been stuck in Albany, WA with his wife Sharon and their 52ft steel ketch "Thomas Tinboy" for 9 months.
Unfortunately they had to abandon their initial departure from Albany after a rather dramatic steering failure under full canvas and subsequent rescue less than 20 nautical miles from Albany.
Between repairs to the steering system and Kevin very kindly offering to crew for me, Thomas Tinboy has sat alongside at Albany Waterfront Marina for a considerable length of time.
Kevin and Sharon purchased Thomas Tinboy at the beginning of the Covid Lockdowns, moving from NSW to WA for a short four month refit before sailing across the bight back to the Newcastle area. Four short years later, and after extensive boat upgrades, they untied the lines at Fremantle Sailing Club and pointed Thomas's bow south for Quindalup.
After some horrific conditions between Fremantle and Quindalup, and Quindalup and Augusta, Sharon made the sensible decision to have a break from bashing into southerly winds and leave the leg from Augusta to Albany to Kevin and I.

Following this rather eventful and unpleasant start to a lengthy voyage back to NSW, Sharon's confidence and motivation for a week-long passage across the Great Australian Bight was limited. Kevin was given instruction to find a suitable crew to assist for the voyage and somehow my name was brought up. (Yes, incredible after being stuck on Emigre with me for five weeks)
My work schedule and availability certainly didn't help them get underway quickly but after nine months of delays and a repaired steering system, the boat and crew were ready to take on the challenge. Or so we thought.
I arrived in Albany late on November 13th. The wind was strong from the South East making the conditions unsuitable to depart. This allowed us some time to go over the boat and systems to make sure everything was shipshape for the journey ahead.
We checked the rigging and sails, tested electrical systems, water maker and plumbing and worked on both the main engine and generator, changing filters and impellers. I noticed a small water leak from the generator's raw water pump and assumed it was the lip seal between the impeller housing and the drive shaft. I removed the impeller, hoses and drive belt before removing the pump from the engine. With careful consultation from the Onan Generator service manual and some firm persuasion from a hammer and brass drift, Kevin and I managed to remove the input shaft, lip seals, wear plate and O rings. The impeller looked to be in tact but upon close inspection of the pump outlet, i noticed a broken impeller blade stuck in the right angle fitting. This piece of impeller blade turned into 15 pieces that restricted the pump's water flow by around 90%.

My friend Steve from the marina kindy took me to the industrial area to pick up some lip seals and o rings so that we could rebuild the pump. With the new seals, impeller and gaskets installed, I fitted the pump to the engine. To our relief, the pump was now leak free and moving ten times the amount of water. I guess the lesson learnt is to always check the pipes and fittings for trapped debris, even if the impeller is in tact.
On Wednesday November 18th, we set off in the late afternoon for the first leg of our voyage, a four mile sail from Albany's Waterfront Marina to Johnson's Cove in Oyster Harbour, near to Emu Point.

In this short voyage on not much more than one hour, we discovered a number of issues that would need to be resolved before our crossing. The clew of the mizzen (The small sail flown from the shorter "Missen" mast at the stern of the vessel) was not attached to the end of the mizzen boom, one of the mainsheet blocks had self destructed and most concerningly, the mainsail had a significant tear in the luff, just under the second reef point.
Thomas Tinboy motored into Oyster Harbour and picked up a mooring at Johnson's Cove, an idyllic anchorage opposite Emu Point. Sharon made Cannelloni for diner which was extremely well received, lifting the mood from our somewhat unsuccessful sea trial. Unsuccessful perhaps, but it certainly served its purpose.
We woke early on Thursday morning with a list of repairs to complete. By 0700 the mainsail had been removed from the mast and boom, battens removed and the sail prepared for sewing. Kevin and Sharon assembled the Strong Arm industrial sewing machine in the main saloon in preparation for the sail repairs.
I launched the ten foot walker bay sailing dinghy and sailed ashore to meet my good mate and next uber driver victim Stu, who took us into town to track down a few more spares including webbing to repair the damaged mainsail.

When I got back to Thomas Tinboy, the sewing machine was ready to go with a number of small tears already patched. Kevin used 50mm webbing strap to reinforce the luff and re-attach one of the sail slides. By lunch time we had the mainsail back on the boom, the dinghy stowed and lashed and Thomas Tinboy and his crew were ready for sea.

We didn't know where our next port of call would be. Perhaps Esperance, perhaps Middle Island or possible even further. At 14:15 on Thursday November 19th, we departed Albany.
To be continued.




Comments